Operation canceled
The calibration or standard value setting operation was canceled before it was completed. This is not an error but an information message. The balance then returns to a usable state.
You can usually fix this yourself.
What should you do?
Try the steps in order.
- Wait for the balance to return to the weighing display.
- If calibration is needed, restart the procedure from the beginning.
Possible causes
- Operation canceled with a key
Do you need service?
This is an information message. No service is needed.
Models showing this code: TW
Source: Shimadzu official user manual · Open manufacturer document
Legal notice
The error code explanations and checks on this page are based on manufacturer manuals and are provided for general information only; they do not replace technical service, diagnosis or warranty. The meaning of a code may vary by model, firmware version and configuration.
The decision to carry out any suggested step, and its consequences, rest with the user. Terazibul cannot be held liable for device damage, weighing errors, data loss, commercial loss or any other direct or indirect damage arising from the use of this information.
On legal-for-trade (verified) scales, adjustment and calibration must only be performed by a qualified technical service in line with legal metrology rules. Disconnect power before opening the device and contact a service provider if in doubt. Brand and model names belong to their respective owners and are used only to identify the device.


